RSS

Monthly Archives: February 2012

Is an Oil Pipeline Planned in Oklahoma? By Brandon Davis

Is there an oil pipeline that is being planned for construction in Oklahoma, asks Brandon Davis of Swan Energy. According to KOCO in Oklahoma, three oil companies are planning a large scale pipeline that will provide the capacity of over 130,000 barrels daily transportation from multiple locations within the state. The pipeline is expected to connect to Cushing, OK, where there is a 1 million barrel oil storage terminal. Cushing is the largest US oil storage facility with an operational capacity of over 66 million barrels as indicated by the US Energy Dept.

The pipeline will provide jobs to the region and add to the ability to transfer larger volumes of crude oil from the Oklahoma oil fields to market. Production is expected to begin in this summer. For more information on this new pipeline development and construction, please read it here and here as well.

 
Leave a comment

Posted by on February 22, 2012 in Oil and Gas Production

 

Tags: , , , , ,

Swan Energy completes another oil drilling at Boo 1-9

During the month of January, Swan Energy has set a goal of drilling 3 wells of the 22 wells it plans to drill this year. The Boo 1-9 is the 2nd well for the month of January. The first well was Moore 1-9. The Boo 1-9 oil project is a Three Tier Joint Venture well.

Click here for a full drilling update video from Swan Energy.

 
Leave a comment

Posted by on February 1, 2012 in Oil and Gas Videos

 

Tags: , , ,

 
Follow

Get every new post delivered to your Inbox.